Automotive partsCompliance and documentation for component export to Japan
Technical standards and document requirements mapped, and key files completed at the prototype stage to protect the delivery date.
Warpage traced through the dimension chain, measurement and flow review, then process and gauge adjustments restored batch stability.

The customer's injection-moulded housing showed intermittent interference at the assembly station. Sampled dimensions fluctuated near the tolerance limit, rework rose, and the cause was unclear.
Flow analysis results did not match measured deviation. The customer wanted the source of the deviation clarified before deciding whether to change the mould.
Warpage occurred mainly along the long edge, related to insufficient cooling time and uneven holding pressure.
After adjustment, critical dimensions of three consecutive batches stayed in the middle of the tolerance band.
Gauges and acceptance rules were recalibrated, and the assembly station no longer depended on manual fitting.
Broke the dimension chain down by assembly relationship to identify which dimensions actually drive interference, instead of working on all dimensions equally.
Sampled critical surfaces and hole positions with a CMM and compared them with flow results to locate where and in which direction warpage occurred.
Adjusted holding pressure curves and cooling time in stages, observed warpage change, and identified the most dimension-sensitive process items.
Reset gauge positioning and acceptance baselines to the adjusted process so line inspection matched the physical part.