Compliance path for a medical packaging material change
A verification list and document structure prepared before trial production, so the material change does not return later as rework.

Background
The customer planned to change the film source for medical packaging. The material was described as having similar performance, but it was unclear which verification items and documents the change would require.
With a limited schedule, the customer wanted to confirm whether the compliance path was viable before investing in trial production.
Results
- 01
Verification items that must be added for the material change were clarified, along with the parts where existing data can be reused.
- 02
Seal process adjustment was identified before trial production, avoiding a batch-level loss.
- 03
The validation plan and record templates went directly into the internal approval flow.
Our work
Contact type and requirement mapping
Confirmed material requirements by contact method and duration of use, and listed the indicators that need reassessment after substitution.
Sterilization compatibility assessment
Compared old and new materials under the established sterilization method to confirm the verification focus for seal strength and barrier integrity.
Verification item design
Sequenced seal strength, peel strength and post-aging integrity tests to avoid repeated trials.
Document structure
Proposed the basic structure of validation plans and record templates so conclusions remain traceable and reviewable.
Process and samples
Have a similar requirement?