Engineering plastic substitution and cost reduction

Two domestic material routes evaluated and one put into trial production, without changing the existing mould or assembly interface.

Tensile test specimens arranged on an inspection bench

Background

The customer's structural part had long depended on imported engineering plastic, with lead times and prices moving with supply. They needed an alternative route that kept torque capacity and fatigue performance while the existing mould and assembly interface stayed untouched.

At kick-off a trial sample already existed, but local stress whitening appeared after assembly, and it was unclear whether the cause was the material or the process parameters.

Results

  1. 01

    One route was excluded for insufficient fatigue resistance; the other moved into trial production.

  2. 02

    Stress whitening was traced mainly to the holding pressure and mould temperature combination; the material itself met the indicators.

  3. 03

    A trial parameter table and incoming inspection points were issued so the customer can continue verification.

Our work

01

Current state and target comparison

Mapped the original material's property indicators, actual service conditions and failure appearance into measurable strength, toughness and dimensional stability targets.

02

Material route comparison

Selected two domestic routes and prepared specimens to the same geometry for tensile, impact and heat deflection comparison, marking the differences.

03

Process window verification

Adjusted melt temperature, mould temperature and holding pressure on the customer's machine, confirmed the source of stress whitening and issued an executable parameter range.

04

Small-batch trial

Ran a small batch of structural parts on the confirmed parameters, completed assembly and torque tests, and reviewed batch-to-batch consistency.